A Kassem, M, Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(09), 2767–93.

Adabre, M A and Chan, A P (2020) Towards a sustainability assessment model for affordable housing projects: the perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(09), 2523–51.

Ahmadu, H A, Ibrahim, A D, Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(09), 2199–219.

Akanmu, A, Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(09), 2577–90.

Almatroushi, H, Hariga, M, As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: an integrated approach. Engineering, Construction and Architectural Management, 27(09), 2135–61.

Amos, D, Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: a developing country perspective. Engineering, Construction and Architectural Management, 27(09), 2715–35.

Chiu, W Y B and Lai, J H (2020) Building information modelling for building services engineering: benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(09), 2221–52.

Edwards, D J, Rillie, I, Chileshe, N, Lai, J, Hosseini, M R and Thwala, W D (2020) A field survey of hand–arm vibration exposure in the UK utilities sector. Engineering, Construction and Architectural Management, 27(09), 2179–98.

Farajmandi, M, Ali, M, Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(09), 2615–41.

Hsu, P, Aurisicchio, M, Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(09), 2501–22.

Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(09), 2661–86.

Liu, H, Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction – method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(09), 2409–27.

Liu, J, Cui, Z, Feng, Y, Perera, S and Han, J (2020) Impact of culture differences on performance of international construction joint ventures: the moderating role of conflict management. Engineering, Construction and Architectural Management, 27(09), 2353–77.

Luo, L, Zhang, L and He, Q (2020) Linking project complexity to project success: a hybrid SEM–FCM method. Engineering, Construction and Architectural Management, 27(09), 2591–614.

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: a qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(09), 2429–49.

  • Type: Journal Article
  • Keywords: Project complexity; Mega construction project; Qualitative comparative analysis (QCA); Project success;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-12-2019-0679
  • Abstract:
    Understanding the impact of project complexity on the mega construction project success will help improve the efficiency of project management. However, the influencing mechanism of project complexity on project success has not been clearly depicted. This paper aims to divide project complexity and project success into five dimensions, trying to explore the impact of different complexity combinations on mega construction project success.Design/methodology/approach This study applies the qualitative comparative analysis (QCA) method to find out the impact of the combinations of different project complexities on the every dimension of mega construction project success. First, 21 cases were interviewed and scored in five categories of project complexities and five aspects of project success. Second, with the QCA program, the combinations of different project complexities influencing every aspect of mega construction project success was obtained.Findings This research found that high organizational complexity or a combination of high environmental complexity and goal complexity can lead to serious schedule delays of mega construction projects, high technological complexity and goal complexity are important reasons for cost overrun, high technological complexity or a combination of high environmental complexity and low organizational complexity usually lead to low quality of mega construction projects, high goal complexity and cultural complexity are important factors affecting the key stakeholders' satisfaction and high technological complexity and environmental complexity are the reasons for the poor sustainability of mega construction projects.Originality/value This study clearly reveals the influencing mechanism of project complexity on mega construction project success, which can help the project managers to understand and assess the complexity of mega construction projects and accurately predict their negative impacts on the mega construction projects.

Maqsoom, A, Hamad, M, Ashraf, H, Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: an investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(09), 2451–75.

Moon, S, Ham, N, Kim, S, Hou, L, Kim, J and Kim, J (2020) Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Engineering, Construction and Architectural Management, 27(09), 2271–86.

Nasirzadeh, F, Kabir, H D, Akbari, M, Khosravi, A, Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(09), 2335–51.

Sezegen, A and Edis, E (2020) Product innovation types: a discussion considering building facade products. Engineering, Construction and Architectural Management, 27(09), 2379–408.

Sinoh, S S, Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: a Malaysian case study. Engineering, Construction and Architectural Management, 27(09), 2737–65.

Tran, D H (2020) Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(09), 2287–313.

Tran, D Q, Harper, C M, Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(09), 2163–78.

Viswanathan, S K and Jha, K N (2020) Risk mitigation modelling of international construction projects executed by Indian firms: a structural equation modelling approach. Engineering, Construction and Architectural Management, 27(09), 2687–713.

Wang, P, Wu, P, Wang, X, Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(09), 2109–33.

Wu, J, Liu, H J, Sing, M C, Humphrey, R and Zhao, J (2020) Public–private partnerships: implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(09), 2253–69.

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(09), 2315–33.

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(09), 2553–76.

Zhang, H, Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(09), 2643–59.

Zhang, S B, Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(09), 2477–500.